Vorinformation
Niederlande – Wasserbauarbeiten – Emissiereductie onderhoudsbaggerwerkzaamheden Rotterdam
Beschreibung
To make dredging operations more sustainable, HbR and RWS intend to jointly tender Lot 3 as a frontrunner project. The ambitions for this lot focus on emission reduction in dredging operations, with CO2 eq., NOx, and PM10 (greenhouse gases, nitrogen oxides, and particulate matter, respectively) serving as key areas of focus, in accordance with the SEB covenant. At present, no medium-sized trailing suction hopper dredger is available that can operate continuously on Renewable Fuels of Non-Biological Origin (RFNBOs) or Renewable Electricity (RE). The frontrunner project aims to stimulate the development of such equipment and deploy it within a multi-year contract, with a significant application of RFNBO/RE.
Dossier: Zuschlagskriterien, Eignung, Checkliste — mit Konto
Mit einem Konto liest Zuschlagsreif die Vergabeunterlagen dieses Verfahrens und erstellt daraus ein Dossier: Zuschlagskriterien mit Gewichtung, Eignungsanforderungen, Zeitplan und eine Checkliste der einzureichenden Unterlagen.
Dossier ansehenAngaben aus der Bekanntmachung
- Auftraggeber
- Havenbedrijf Rotterdam N.V.
- Ort
- Rotterdam
- CPV
- 45240000 — Wasserbauarbeiten
- Veröffentlicht
- 05.05.2026
- Quelle
- TED (EU-Amtsblatt)
Zum Vergabeportal
Verbindlich sind allein die Angaben auf dem Vergabeportal. Stand dieser Seite: 11.09.2026, 19:08.